First thing he did was he drilled seven 1 1/2 inch holes in the stone, which will be used to anchor the railing.




Last but not least by a long shot! MY HALF BATH IS 98% COMPLETE AND THE MASTER BATH 93.5% COMPLETE!!!!!!!!!!!!!!!!!!!!!!!!!!!!! I'll post a video tour as soon as I edit the rough copy.
They finished the last of the spackling today and all that's left to be done of the major work install the vanity top in the half bath and install the vanity, medicine chest and lights in the master bath. They will get done as soon as they are manufactured.
The best news is that in 24 hours I'll be able to use my shower again!!!
1 comment:
Can't wait to see the final views!!
Post a Comment