Wednesday, August 29, 2007

Remodeling Update

Today Carlos came back to install the hand rail for the stoop and to replace the siding where it had to be removed to rebuild the footing of the house.

First thing he did was he drilled seven 1 1/2 inch holes in the stone, which will be used to anchor the railing.














Then he started to work on the siding. He'll finish the siding today, but will have to come back tomorrow to install the railing.







I hired a sprinkler system contractor to work on the sprinkler system. He has to add a few heads to the flower beds in the front of the house, reposition a few sprinkler heads around the yard, repair some heads that have broken and move the valve box that is now in the yard into the flower bed. In this shot his digging to reposition the valve box.



Last but not least by a long shot! MY HALF BATH IS 98% COMPLETE AND THE MASTER BATH 93.5% COMPLETE!!!!!!!!!!!!!!!!!!!!!!!!!!!!! I'll post a video tour as soon as I edit the rough copy.

They finished the last of the spackling today and all that's left to be done of the major work install the vanity top in the half bath and install the vanity, medicine chest and lights in the master bath. They will get done as soon as they are manufactured.

The best news is that in 24 hours I'll be able to use my shower again!!!

1 comment:

Tara Tainton said...

Can't wait to see the final views!!